Skip to content
CN2.DEVBUKYA NARESH
RISKDOCUMENTEDENTRY 04 / 08

QUESTION

What changes when risk controls run before order construction rather than as post-trade reconciliation?

  1. 01

    HYPOTHESIS

    Structural pre-trade controls — risk cap, R:R floor, cost-budget filter — change the population of admitted trades, not just their outcomes.

  2. 02

    METHOD

    Pipeline architecture with controls as gates: position size derives from stop distance and risk cap; setups failing the 1:4 R:R floor or cost budget never reach execution.

  3. 03

    EVIDENCE

    automated_trading_os implements 1% per-trade risk cap, minimum 1:4 R:R, fee/slippage modelling, cost-budget filtering, profit lock and giveback limit.

  4. 04

    RESULT

    The admitted-trade population is defined by rules rather than discretion; every admitted trade satisfies all structural constraints by construction.

  5. 05

    LIMITATION

    Ablation studies quantifying each control's individual contribution are ongoing.

  6. 06

    CONCLUSION

    Order-of-operations matters: controls applied after sizing are advice; controls applied before are physics.

EVIDENCE SOURCE

AUTOMATED TRADING OS

A trade is not a signal — it is a pipeline of decisions from higher timeframe context down to fill, each stage governed by explicit risk rules.

METHOD — PAPER · STRUCTURAL TEST